.Our ingenuity fuels daily life. Together, we've forged some of the most trusted partnerships across the energy value chain to make what was once just an idea a reality: laying subsea infrastructure thousands of feet below sea level, installing platforms hundreds of miles from shore, using our expertise to design and build offshore wind infrastructure, and reshaping the onshore landscape to deliver the energy products the world needs safely and sustainably.For more than 100 years, we've been making the impossible possible. Today, we're driving the energy transition with more than 30,000 of the brightest minds across 54 countries.Job DescriptionJob Overview:Develop structural modeling using TEKLA, multi-user mode, or single user only if requested, modeling from design drawings. Use of AutoCAD 2D/3D and MicroSAS software. Perform and issue the IFC (Issued for Fabrication) Structural Shop Drawings, through the appropriate Document control systems or channels, keeping records of it. Coordinate and review structural engineering in accordance with General Notes, welding requirements, fabrication project specification, material specifications, and supplier information to ensure that the executed work meets the Project and Bid requirements and timelines. Ensure that deliverables such as Approved for Construction are within procedures. Control and approve all documentation developed by the structural lofting discipline issued on the project. Provide a Progress Report, as required.ResponsibilitiesKey Tasks and Responsibilities:Coordination of Structural Lofting activities, supervision of associate structural designer and structural designerDesign engineering review for constructability analysisProvide assistance in reviewing and/or developing structural material volumes for Bills of Materials (Material Take Off)Provide support to Fabrication Construction Support Engineering activities as requiredProvide technical support to Procurement, Production, Construction, Engineering, and Fabrication areasInteract with other departments such as planning, construction, fabrication, project management, contracts, etc. for clarification, scopes, responsibilities, etc.Elaboration and follow-up to the closure of technical queries, deviation requests, requests for information, etc.Identification, control, and closure of "HOLDS", workshop and/or design "REDLINES"Keep being informed regarding the results of the Key Performance Indicator measurement and take the required corrective actionsCoordinate with fabrication and marine representatives to identify construction sequence and preferred design detailsInteraction with the MTO team for changes in materials specified in the design and changes due to market availability, follow up on drawing updates